CPL has been involved in role of Consultant /
Supervisor / Designer / Current or Control
Accredited Laboratory on following Projects:

Supervision and Consultancy services on LOT B1-B2-B3.1, Belgrade By-pass Project, Construction works of E-70/E-75 motorway: from Dobanovci Interchange to Bridge No.8 over River Sava, sections B1, B2 and part of B3 (II phase), from km 565+175,00 to km 575+230,00, l=10km, Financed by the EIB, Employer PE Roads of Serbia, 2013. – 2015.

Construction works on Motorway E-763, Section Ljig – Preljina, 3 sections, Ljig – Boljkovci, Boljkovci – Takovo, Takovo – Preljina, Total length of the motorway 40km including 5 tunnels, 65 bridges, 25 km of relocation of local roads, Investment value 330 mil.eur., Contractor: AZVIRT LLC, Baku, Azerbaijan, Employer: Corridors of Serbia LLC, Financed by the credit from the side of Government of Azerbaijan, Contract made on basis of the FIDIC Red Book., 2012. – 2017.

Supervision services and Technical control of Detailed design on LOT 22, Rehabilitation of the IA class state road number 2: Belgrade – Ljig – Preljina (M-22), l=14.3km, section: Gukoši – Dići – Ugrinovci, Financed by the EIB, Employer PE Roads of Serbia, 2013.

Supervision of construction works on LOT 19, Road M-5 rehabilitation, section Užice – Požega, l=5.0km, Financed by the EIB, Employer PE Roads of Serbia, 2012.

Construction of the Motorway E-75, Horgos – Novi Sad, from km 1+125 to km 108+000 and from BC Kelebija to loop Subotica South, from km 1+123 to km 23+112, with a total length of 128.86km, investment value of 110 mil.EUR. Employer: “Ministry of Infrastructure” Government of Serbia, Belgrade, Contractor: JV “Beograd” AD, “Putevi Užice” AD, GP”PLANUM” AD, “Borovica transport” DOO”, 2010 – 2012.

Construction of new Beška bridge and reconstruction of existing Beška bridge on the Motorway E-75, Novi Sad – Belgrade, investment value of 80 mil.eur. Employer: PE “Roads of Serbia”, Belgrade, financed by the EIB, EBRD and WB (FIDIC Contracts, Red Book except for new Bridge Yellow Book), Contractor: “ALPINE BAU Belgrade Branch”, 2010. – 2014.

Rehabilitation works on the Motorway E-75 Belgrade – Niš, Section passage through Belgrade, from Airport “Nikola Tesla” to the pay toll station “Bubanj Potok”, from km 564+582 to km 594+300, the length of 29.7km, Employer: Republic Road Directorate – PERS, Belgrade, Contractor: “Porr Technobau und Umwelt Aktiengesellschaft” GmbH and “TERRAG ASDAG” GmbH, 2009. – 2013.

Construction of the Motorway E-80, Dimitrovgrad Bypass, from km 92+905.55 to km 101+578.12, LOT 1 Roads and LOT 2 Bridges, investment value of 30 mil.eur., Employer “Corridors of Serbia” LLC, Belgrade, financed by the EIB, EBRD and WB (FIDIC Contracts, Red Book), Contractor: “ALPINE BAU Belgrade Branch”, Belgrade, 2010 – 2012.

Construction of Motorway E-80, Section Pirot (East) – Sukovo, LOT1, from km 79+988.05 to km 86+893.09, length l=6.0km, investment value of 10 mil.eur. Employer “Corridors of Serbia” LLC Belgrade, financed by the EIB, EBRD and WB (FIDIC Contracts, Red Book), Contractor: “ALPINE BAU Belgrade Branch”, Belgrade, 2010 – 2012.

Construction of Motorway E-80, Section Sukovo – Dimitrovgrad, LOT2, from km 86+893.09 to km 95+731.17, length l=8.3km, investment value of 20 mil.eur. Employer “Corridors of Serbia” LLC, Belgrade, financed by the EIB, EBRD and WB (FIDIC Contracts, Red Book), Contractor: “ALPINE BAU Belgrade Branch”, Belgrade, 2010 – 2012.

Construction of the Motorway E-75, BC Horgoš – Novi Sad, the new left lane section from km 28+000 to km 38+000, Employer “Corridor 10” LLC, Ministry of Infrastructure, Belgrade, investment value of 7.7 million. eur., Contractor: JV “PZP “Beograd”AD, “INTER KOP”DOO, “Borovica transport”DOO”.,2009.

Construction of the Motorway E-75, BC Horgoš – Novi Sad, the new left lane, section from km 98+000 to km 108+000, Employer “Corridor 10” LLC, Ministry of Infrastructure, Belgrade, investment value of 7.6 million. eur., Contractor: “Putevi Užice”AD. 2009.

Consultancy services / Supervision on the Construction works on reconstruction of national road network in Serbia, length 55km, motorways, main and regional roads, financed by the EIB and EBRD (FIDIC contract, Red book except for LOT5c Yellow book). 2005. – 2007., Employer: Republic road directorate, Belgrade, Investment walue 30 mil.euro.

 

  • LOT 13 Main road M-19: Čukarica – Ostružnica: from km 0+000 to km 10+614, length 10.614km
  • LOT 14 main road M-24.1:Čenta – Besni Fok: km 27+372 to km 37+984, length 10.612km
  • LOT 15 Highway Beograd – Pančevo: M-1.9 (E-70): km 0+000 to km 7+300, length 7.3km,
  • LOT 5c Main road M-21 (E-760): Borova Glava – Kokin Brod: km 262+867 to km 278+467, length 15.6km
  • LOT 6c main road, Northern bypass of the city of Kruševac, km 0+000 to km 6+990, length 6.99km

Consultancy services and Supervision on the Construction works for the reconstruction of national road network in Republic of Serbia, length approx. 900 km, motorways, main and regional roads, financed by the EIB and EBRD (FIDIC contract, Red Book), 2003. – 2006., Employer: Republic road directorate, Belgrade, Investment value 190 mil.eur.

 

  • LOT 1, main road M-22 (Highway E75), Section I, Backa Topola – Srbobran, length 42.45km, Section II Srbobran – Novi Sad, length 20.00km,
  • LOT 2, main road M-1 (Highway E70), Section I Croatia Border – Kuzmin – Ruma length 57.10km, Section II Ruma – Simanovci, length 30.18km, Section III Simanovci – Beograd, length 16.82km, M-22 Section IV Batajnica – Beograd, length 6.91km, main road M-18 Section V Kuzmin – Border B&H, length 17.59km
  • LOT 3 main road M-1 (Highway E75) Section I Pozarevac – Batocina, length 50.89km,
  • LOT 4 main road M-1.9 (Highway E70), Section I Pancevo – Banatski Karlovac, length 23.78km,
  • LOT 6c main road M-1.9 (Highway E70) Section I Vladimirovac – Vrsac, length 36.72km,
  • LOT 5 main road M-21 (Highway E760) Section I Kokin Brod – Nova Varos, length 9.14km, Section II Nova Varos – Bistrica, length 15.36km, Section III Bistrica – Kolovrat, length 14.98km,
  • LOT 5b main road M-21 (E760) Section I Kolovrat – Gostun, length 30.90km,
  • LOT 7 main road M-1 (Highway E75) Section I Batocina – Pojate, length 57.51km, Section II Pojate – Nis, length 54.83km, Section III Nis – Pecenjevci, length 37.00km,
  • LOT 8 main road M-1 (Highway E75) Section I Pecenjevci – Grdelica, length 29.64km, Section II Dzep – Vladicin Han, length 9.55km, Section III Vladicin Han – Vranje 1, length 20.29km, Section IV Vranje South – Bujanovac – Presevo, length 34.85km
  • LOT 9 main road M-22 (E760) Section I Stavice – Rudnik, length 8.15km, Section II Rudnik – Nevade, length 4.80km
  • LOT 10 main road M-22 (E760) Section I Stepojevac – Celije- Zupanjac, length 22.61km, Section II Nevade – Gornji Milanovac – Preljina, length 17.88km
  • M-5 (E761) Section III Beranovac – Vrnjci, length 20.10km, Section IV Cair – Stopanja, length 11.00km, Section V Stopanja –Citluk, length 9.97km, Section VI Cacak – Preljina – Mrcajevci, length 17.84km
  • LOT 11 main road M-1.12 (E760) Section I Niska Banja – Crvena Reka, length 21.62km, Section II Bela Palanka – Pirot, length 27.61km, Section III Sukovo – Bulgarian Border, length 21.46km, R-241a Baypass on Section I, length 8.72km
  • LOT 12 main road M-22 (E760), Section I Mataruska Banja – Usce, length 38.14km, Section II Novi Pazar – Ribarici, length 24.34km.

Preliminary and Detailed designs for sections of the Motorway E-75, section: Horgoš – Novi Sad – Belgrade, from km 1+125 to km 70+400 and from 70+400 to km 108+000, from km 108+000 to km 120+000, from km 120+000 to km 173+450 (reconstruction of the existing right lane and construction of the new left lane with bridges, overpasses, intersections and all kinds of structures, divided in several motorway designs and projects), l=173,4km, Employer: PE Roads of Serbia, Belgrade, 12 projects, Investment value over 200 mil.eur., 2005. – 2009.,

Detailed design of Rehabilitation of the Motorway E-75 Belgrade – Nis, Section passage through Belgrade, from Airport “Nikola Tesla” to the pay toll station “Bubanj potok”, from km 564+582 to km 594+300, the length of 29.7km, Employer: Republic road directorate – PERS, Belgrade, 2007. – 2008.

Consulting services for the development of the Road Data Base in Serbia, Contract WBC / RFP / 2005-01 (Consulting services for Road Data Base in Serbia, WBC / RFP / 2005-01), Employer: PE Roads of Serbia, Belgrade, funded by the World Bank (financed by the World Bank) on the road network of the Republic of Serbia, a length of 13.200km, 2007. – 2010.

Supervision of construction works and Detailed design of pavement rehabilitation on Main and Regional roads (I and II class state roads), Road sections on road network in region of South Lebanon, Lebanon, length 175km, Client: Iranian contributory organization for reconstruction of Lebanon, 2009. – 2012.

Supervision of the construction works and Detailed design of the motorway Chtaura-Rayak-Baalbeck-El Qaa in Lebanon, section: Baalbeck – Tofighieh, L=42 km, Client: Iranian contributory organization for reconstruction of Lebanon, 2007. – 2011.

Detailed design of the rehabilitation of I class state road Semnan – Damghan in Iran, L=160 km, Financed by the National Budget, Iran, 2008. – 2009.

Supervision of the construction works of the Highway reconstruction and new construction and review and upgrading of existing detailed designs on E60 Highway Tbilisi – Gori – Batumi, section km 43 – km 55 and km 55 – km 80, Total length 37km, Employer: Roads department of the ministry for regional development and infrastructure of Georgia, Financed by the World Bank. 2007. – 2013.

Detailed design of pavement rehabilitation on Main road M-24, section: Kikinda – Bašaid, from km 85+634,00 to km 99+731,60, length 14,1km, Employer: PE Roads of Serbia, 2010.

Design services for Building and planning Cross-border road between Num 51 road Baja I part – Sombor (Detailed design of rehabilitation – upgrading of two sections of I class state roads M-18, section Hungarian border (Backi Breg) – Bezdan and M17.1, section Bezdan – Sombor and conceptual designs of new Bypasses arround Bezdan, Kolut and Backi Breg, total length 28.8km), (EuropeAid/131050/D/SER/RS), Client: City of Sombor, Sombor, Serbia, Financed by the Delegation of the European Union to the Republic of Serbia, 2011. – 2012.

Supervision of the rehabilitation of the Gazela bridge in Belgrade, Length 3.395m, Serbia (EuropeAid / 122806 / D / SER / YU), Financed by the: Delegation of the European Union to the Republic of Serbia, Employer PE Roads of Serbia. 2008 – 2012.

Technical control of the Main Design for LOTA1 Belgrade Bypass, Highway E-75, intechange “Batajnica” od km 184+738.24 do km 188+680.00, Investment value 35 mil.eur., Contractor: JV “Planum AD and MBA Miljkovic DOO”, Serbia, Financed by the EIB and EBRD, European Banks, FIDIC Yellow book, Employer: PE Roads of Serbia.

Pavement reconstruction detailed design for Road II – 19, Razlog – Bansko – Goce Delcev – Sadovo, section from km 36+570 to km 93+670, Length 57.1km, in Bulgaria, 2012. – 2013., Financed by the Bulgarian government and European financial institutions.

Pavement reconstruction detailed design for Road II – 84, Yundola – Razlog, section from km 54+390.02 to km 107+114.21, Length 52.7km, in Bulgaria, 2012. – 2013., Financed by the Bulgarian government and European financial institutions.

Bridge Trial Load Testing, Material Testing and Verifying the Structural Adequacy of the Liakhvi Bridge, Georgia, l= 2 x 877m, Client: Roads Department of the Ministry of Regional Development and Infrastructure of Georgia, Tbilisi, GEORGIA., Project financed from the side of World Bank, 2013.

Trial Bridge Load Testing according to SRPS U.M1.046 and Main Design of bridge rehabilitation, Bridge over river Crnica in village Glavica, on Main Road M-5, at km 744+800, Serbia. Employer: PE “Roads of Serbia”, Belgrade. Concrete bridge, Bridge length 100m, April 2012.

Trial Bridge Load Testing according to SRPS U.M1.046 within Main Design of bridge rehabilitation, Bridge over railway tracks, on Main Road M-5, at km 746+450, Serbia, Employer: PE “Roads of Serbia”, Belgrade. Concrete bridge, Bridge length 40m, May 2012.

Geotechnical documentation and report with terrain investigation works for a detailed design of rehabilitation of embankment between channels Vrbas – Bezdan (from km 14+035 to km 14+235) and channel KI-64 (from 7+855 to km 8+055) with sanation of unstable lanslides, Employer JVP “Waters of Vojvodina”,2011.

Detailed design of upgrading of the national road of the second class (regional road) number 109, section Inđija – Slankamen, from km 27+500 to km 28+900, with sanation of unstable lanslides on entrance to Slankamen (ID section 2204 in the reference system of PE “Roads of Serbia”) Investor: PE Roads of Serbia, 2010.

Geomechanical report with geotechnical investigation works, laboratory testing, geophysical and seismic refraction measurements for micro zoning for Amine plant KN-SU-96-08-TON, Elemir – P and LPG, Serbia, Client: Oil Industry of Serbia – NIS, Serbia. 2012.

Geomechanical report of geotechnical and hydrogeological investigations of foundation conditions for underground parking in the Square of the Republic and the Riblja Pijaca in the center of the city of Novi Sad, Employer: PE Parking Servis, Novi Sad, 2012.

And many others…